extension of st barnabus school bradford

Traditional Contract :
Heaton St Barnabas School, Bradford

Heaton St Barnabas School, Bradford completed in September 2008

The Brief:
To extend the existing school to provide additional administration areas, new entrance and internal refurbishment together with associated external works, drainage, and landscaping.The works were carried out when the school was live

We had to ensure minimum disruption as the works were carried out during term time.

The construction of this single storey extension and refurbishment was carried out using the following methods:


  • Steel reinforced concrete raft foundations
  • Ground bearing steel and fibre reinforced floor slab
  • Traditional cavity external walls
  • Decoration and floor coverings throughout
  • M & E Installation
Architect: Haliday Clark

Structural Engineer: Met Consulting

Client's Agent: Rex Procter